Skip to main content
Alerts
-
Station Closure
Ongoing
Commuter Rail train service is suspended at Haverhill station through Summer 2025 to allow for work on the South Elm Street Bridge. An accessible van operates between Haverhill and Bradford.
Built in 1906, the South Elm Bridge is beyond its useful life and ready to be replaced. Using accelerated bridge construction techniques to reduce customer and traffic impacts, the MBTA will replace the nearly-120-year-old bridge with a modern single-span structure with a useful life of 75 years. The new structure will include a ballasted steel deck, which means a smoother ride for passengers. The MBTA will also perform roadway, sidewalk, and drainage improvements along South Elm Street.
Updated: 7/30/2024 10:08 AM EDT
-
Delay
Haverhill Line Train 206 (8:25 am from Bradford) is operating 10-20 minutes behind schedule between Bradford and North Station due to a temporary speed restriction at crossings in the Lawrence area.
Affected direction:Inbound
Updated: 2/5/2025 9:07 AM EST
-
Parking Issue
Ongoing
The Oak Grove Station Parking Lot has reduced availability through Monday, Mar 31, 2025, due to construction. Alternative parking is available at Wellington and/or Station Landing Garage (levels 6-8).
-
Escalator Closure
Ongoing
Oak Grove Escalator 105 (Commuter Rail platform to unpaid lobby) unavailable