Skip to main content

Haverhill

Service Alerts For Haverhill Line Close
  • Track Change (Ongoing)
    Bridge construction is complete and normal boarding patterns have resumed at Bradford and Haverhill stations. Please board all inbound trains on the inbound platform and outbound trains on the outbound platform.

    Inbound trains 216 (1:50 from Haverhill)) and 222 (6:09 from Haverhill) will operate as normal train service and should be boarded on the inbound platform at Bradford station.
    Please refer to station LEDs for any updates regarding track changes.
    Last Updated: 4/23/2018 06:36A
  • Station Issue (Ongoing)
    The exterior staircases at Anderson/Woburn will be replaced one at a time beginning Monday, February 26th, 2018. Work is expected to take approximately 12 weeks.

    Please use caution accessing the station and on the platforms while crews work to make these necessary improvements.
    The two staircases at the end of the platform away from the station building will both be closed for approximately six weeks once work is completed on the staircases by the building. Please allow additional travel time to be on the platform 5-10 minutes prior to the train's scheduled departure.

    Affected routes:
    Haverhill Line
    Lowell Line
    Last Updated: 3/3/2018 06:26A
  • Station Issue (Ongoing)
    Access to the east entrance of North Station is available through a covered walkway. Legends Way is closed to pedestrian access.

    Customers are advised that the pedestrian route for customers transferring from the Green and Orange Line exits at Causeway and Beverly St into North Station Commuter Rail will be moved slightly to accommodate ongoing construction work.
    After crossing Causeway St, pedestrians will use a protected walkway along the east side of Legends Way, directly abutting Portal Park. The walkway will include a barrier and kick-plate for blind and low vision passengers.
    As an alternative, customers may consider utilizing the west exit from North Station Commuter Rail due to congestion.
    Last Updated: 11/22/2017 12:55P
Track Change: Bridge construction is complete and nor… Track Change: Bridge construction is complete and normal boarding patterns have resumed at Brad… Track Change: Bridge construction is complete and normal boarding patterns have resumed at Bradford and Haverhill stations. Please board all inbound trains… Track Change: Bridge construction is complete and normal boarding patterns have resumed at Bradford and Haverhill stations. Please board all inbound trains on the inbound platform and outbound trains on the outbound… Track Change: Bridge construction is complete and normal boarding patterns have resumed at Bradford and Haverhill stations. Please board all inbound trains on the inbound platform and outbound trains on the outbound platform. +2 more View

Route Map

Stops

line-cr Created with Sketch.
line-cr Created with Sketch.
Melrose Cedar Park
Zone 1
Melrose Highlands
Zone 1
line-cr Created with Sketch.
North Wilmington
Zone 3
line-cr Created with Sketch.

Route Map

Hours of Operation

Monday to Friday:

Inbound: 05:05A-11:55P

Outbound: 06:43A-01:18A

Saturday:

Inbound: 07:15A-11:16P

Outbound: 08:40A-12:37A

Sunday:

Inbound: 07:15A-11:16P

Outbound: 08:40A-12:37A

Holiday Schedule Information

Upcoming Holidays:
  • Memorial Day (May 28, 2018)
  • Independence Day (July 4, 2018)
  • Labor Day (September 3, 2018)
View all holiday schedule changes