Silver Line - SL1 & SL3 will be detoured from 10:30 PM to the end of service on Fri, Nov 22 and Sat, Nov 23, due to the closure of I-90 West Ramp F. Inbound service will be diverted to the Sumner Tunnel.
Passengers can board at an additional stop at Summer St @ South Station (Red Line entrance).
Northern Ave @ Tide St (inbound) and Northern Ave @ Tide St (outbound) stop will be moving about 100 feet away from 6:00 AM to 8:00 PM on Sat Nov 23 due to construction.
Silver Line - SL1 & SL3 will be detoured from 10:30 PM to the end of service on Fri, Nov 22 and Sat, Nov 23, due to the closure of I-90 West Ramp F. Inbound service will be diverted to the Sumner Tunnel.
Passengers can board at an additional stop at Summer St @ South Station (Red Line entrance).
Silver Line - SL1 & SL3 will be detoured from 10:30 PM to the end of service on Fri, Nov 22 and Sat, Nov 23, due to the closure of I-90 West Ramp F. Inbound service will be diverted to the Sumner Tunnel.
Passengers can board at an additional stop at Summer St @ South Station (Red Line entrance).
Updated: 11/21/2024 12:00 AM EST
Stop Move
Upcoming
Northern Ave @ Tide St (inbound) and Northern Ave @ Tide St (outbound) stop will be moving about 100 feet away from 6:00 AM to 8:00 PM on Sat Nov 23 due to construction.
The following stop is closed beginning Fri Nov 22 due to construction: Ames St @ Broadway (outbound).
Two new stop locations will be established: -Main St @ Ames St will be located on Main St, farside of Ames St (Routes 64, 68, 85). -Galileo Way @ Main St will be located on Galileo Way, farside of Main St (CT2). An accessible, concrete landing pad has been constructed here.
Northern Ave @ Tide St (inbound) and Northern Ave @ Tide St (outbound) stop will be moving about 100 feet away from 6:00 AM to 8:00 PM on Sat Nov 23 due to construction.
The Alewife front entrance at Cambridge Park Dr. is closed weekdays from 8 AM to 4 PM due to construction. All buses will use the back entrance at Alewife station via Access Rd.
The Alewife front entrance at Cambridge Park Dr. is closed weekdays from 8 AM to 4 PM due to construction. All buses will use the back entrance at Alewife station via Access Rd.
The following stop is closed beginning Fri Nov 22 due to construction: Ames St @ Broadway (outbound).
Two new stop locations will be established: -Main St @ Ames St will be located on Main St, farside of Ames St (Routes 64, 68, 85). -Galileo Way @ Main St will be located on Galileo Way, farside of Main St (CT2). An accessible, concrete landing pad has been constructed here.
Affected routes: CT2 64 68 85
Updated: 11/21/2024 12:00 AM EST
Stop Closure
Upcoming
The following stop is closed beginning Fri Nov 22 due to construction: Broadway @ Galileo Way (inbound).
Riders are encouraged to use bus stop Main St @ Kendall Station.
The following stop will be closed on Monday, Dec 2, 2024 due to construction: Harvard Sq @ Garden St - Dawes Island. Bus Route 66 Riders: please board at Waterhouse St @ Mass Ave. Bus Route 86 Riders: please board at Eliot St @ Bennett St.
The Alewife front entrance at Cambridge Park Dr. is closed weekdays from 8 AM to 4 PM due to construction. All buses will use the back entrance at Alewife station via Access Rd.
The following stop is closed beginning Fri Nov 22 due to construction: Ames St @ Broadway (outbound).
Two new stop locations will be established: -Main St @ Ames St will be located on Main St, farside of Ames St (Routes 64, 68, 85). -Galileo Way @ Main St will be located on Galileo Way, farside of Main St (CT2). An accessible, concrete landing pad has been constructed here.
Affected routes: CT2 64 68 85
Updated: 11/21/2024 12:00 AM EST
Stop Closure
Upcoming
The following stop is closed beginning Fri Nov 22 due to construction: Broadway @ Galileo Way (inbound).
Riders are encouraged to use bus stop Main St @ Kendall Station.
The Alewife front entrance at Cambridge Park Dr. is closed weekdays from 8 AM to 4 PM due to construction. All buses will use the back entrance at Alewife station via Access Rd.
The following stop is closed beginning Fri Nov 22 due to construction: Ames St @ Broadway (outbound).
Two new stop locations will be established: -Main St @ Ames St will be located on Main St, farside of Ames St (Routes 64, 68, 85). -Galileo Way @ Main St will be located on Galileo Way, farside of Main St (CT2). An accessible, concrete landing pad has been constructed here.
Affected routes: CT2 64 68 85
Updated: 11/21/2024 12:00 AM EST
Stop Closure
Upcoming
The following stop is closed beginning Fri Nov 22 due to construction: Broadway @ Galileo Way (inbound).
Riders are encouraged to use bus stop Main St @ Kendall Station.
Starting December 15, Route 86 will be permanently shortened to run from Reservoir to Harvard. It will no longer continue to Sullivan. Riders traveling from Harvard to Sullivan can use Route 109. Learn more: MBTA.com/86
Changes on December 15: • Route 86 will run more frequently during midday, evenings, and weekends. • It will run from 5 AM to 1 AM daily. • Route 86 will be shortened to run from Reservoir to Harvard in Cambridge. It will no longer continue north to Sullivan. • Riders traveling from Harvard to Sullivan can use Route 109, which will replace Route 86 on this part of Washington Street. • Route 109 will be upgraded to a Frequent Bus Route, with service every 15 minutes or better. • Riders can transfer at Harvard towards Sullivan in the Upper Busway, and transfer towards Reservoir at street level at Eliot St and Bennett St.
Updated: 10/17/2024 12:22 PM EDT
Stop Closure
Upcoming
The following stop will be closed on Monday, Dec 2, 2024 due to construction: Harvard Sq @ Garden St - Dawes Island. Bus Route 66 Riders: please board at Waterhouse St @ Mass Ave. Bus Route 86 Riders: please board at Eliot St @ Bennett St.
Starting December 15, Route 104 will be permanently rerouted to offer service between Malden and Airport Station. From Everett Square, it will go east to Airport Station. Riders to Sullivan can use Route 109. Learn more: MBTA.com/104
Changes on December 15: • Service will increase to every 15 minutes or better every day during service hours as Route 104 is upgraded to a Frequent Bus Route. • Service will run from 4 AM to 1:07 AM weekdays, 4 AM to 1:05 AM Saturdays, and 4 AM to 1 AM Sundays. • Route 104 will be rerouted to offer new, crosstown service between Malden and Logan Airport. It will follow the existing route from Malden Center to Everett Square. Instead of going south to Sullivan, it will go east to Airport. • Riders traveling to stops toward Sullivan beyond Everett Square can transfer to Route 109 at Broadway @ Norwood St. Riders traveling between Sullivan and Everett Sq towards Malden Center can take Route 109 to Broadway @ Everett Sq and transfer to Route 104 towards Malden Center. Route 109 will also be upgraded to a Frequent Bus Route.
Updated: 10/17/2024 12:23 PM EDT
Parking Closure
Upcoming
The Malden Center parking lot will be closed on Friday Dec 6 and Monday Dec 9 (full day closure) due to construction.
Alternate Parking is available at Wellington or Oak Grove.
Route 108 detoured from 7:00 AM to 5:00 PM on Fri Nov 22 due to construction (inbound only). Connections can be made at Lynn St @ Beach St and Salem St @ Home St.
Affected direction: Inbound
Affected stops: Beach St @ Lawrence St Beach St @ Clapp St Hunting St @ Salem St 68 Hunting St opp Hunting Playground Salem St opp Wescott St Salem St opp Bellvale St
Updated: 11/21/2024 12:00 AM EST
Parking Closure
Upcoming
The Malden Center parking lot will be closed on Friday Dec 6 and Monday Dec 9 (full day closure) due to construction.
Alternate Parking is available at Wellington or Oak Grove.
Starting December 15, Route 109 will be permanently extended past Sullivan Square to Harvard Square. This extension of Route 109 will replace the existing Route 86 on Washington Street between Sullivan and Harvard. Learn more: MBTA.com/109
Changes on December 15: • Service will increase to every 15 minutes or better every day during service hours as Route 109 is upgraded to a Frequent Bus Route. • Service will run from 4:55 AM to 1:22 AM weekdays, and 5 AM to 1:20 AM on weekends. • It will continue to run from Linden Square to Sullivan Square, and will be extended south past Sullivan to Harvard. This extension of Route 109 will replace the existing Route 86 on Washington Street between Sullivan Square and Harvard Square. • This extended route will provide a new direct connection from Everett to the Green Line in Somerville and the Red Line at Harvard Square.
Starting December 15, Route 110 service will increase to every 15 minutes or better every day during service hours as it is upgraded to a Frequent Bus Route. All Park & Broadway trips will be extended to Wonderland. Learn more: MBTA.com/110
Changes on December 15: • Service will increase to every 15 minutes or better every day during service hours as Route 110 is upgraded to a Frequent Bus Route. • Service will run from 5 AM to 1:25 AM weekdays and Saturdays, and from 5 AM to 1 AM Sundays. • There will be no route changes to Route 110. It will continue to serve the same route it does today. • Some bus stop locations in Revere Center will be modified.
Starting December 15, Routes 116 and 117 will be combined into one Route 116. It will make all existing Route 116 stops between Wonderland and Maverick and become a Frequent Bus Route, with service every 15 minutes or less. Learn more: MBTA.com/116
Changes on December 15: • Routes 116 and 117 will be combined into one route, which will follow the same route used by Route 116 today between Wonderland and Maverick. • Route 116 will become a Frequent Bus Route, with service every 15 minutes or better during service hours. • Service will run from 5 AM to 1:25 AM weekdays and Saturdays, and from 5 AM to 1 AM Sundays. • Route 117 will be discontinued. Riders accessing locations on Central Ave and Beach Street may use Route 110, transferring to 116 at Broadway and Park Ave in Revere or at Wonderland.
Starting December 15, Route 117 will be discontinued and replaced by the existing Route 116 route between Wonderland and Maverick. For service along Central Ave and Beach St in Revere, riders can use the now frequent Route 110. Learn more: MBTA.com/117
Changes on December 15: • Routes 116 and 117 will be combined into one route, which will follow the same route used by Route 116 today between Wonderland and Maverick. • Route 116 will become a Frequent Bus Route, with service every 15 minutes or better during service hours. • Service will run from 5 AM to 1:25 AM weekdays and Saturdays, and from 5 AM to 1 AM Sundays. • Route 117 will be discontinued. Riders on Central Ave and Beach St may use Route 110, transferring to Route 116 at Broadway @ Park Ave in Revere or at Wonderland. Riders traveling between Maverick and Revere Center looking to access stops on Central Ave and Beach St may use Route 116, transferring to Route 110 at Broadway @ Central Ave.
The Alewife front entrance at Cambridge Park Dr. is closed weekdays from 8 AM to 4 PM due to construction. All buses will use the back entrance at Alewife station via Access Rd.