Haverhill
Filter by type
Alerts
-
Station Closure OngoingCommuter Rail train service is suspended at Haverhill station through Summer 2025 to allow for work on the South Elm Street Bridge. An accessible van operates between Haverhill and Bradford.Built in 1906, the South Elm Bridge is beyond its useful life and ready to be replaced. Using accelerated bridge construction techniques to reduce customer and traffic impacts, the MBTA will replace the nearly-120-year-old bridge with a modern single-span structure with a useful life of 75 years. The new structure will include a ballasted steel deck, which means a smoother ride for passengers. The MBTA will also perform roadway, sidewalk, and drainage improvements along South Elm Street.Updated: 7/30/2024 10:08 AM EDT
-
DelayHaverhill Line Train 295 (5:05 pm from North Station) is operating 5-15 minutes behind schedule between Oak Grove and Reading.Affected direction:
OutboundUpdated: 11/18/2024 5:28 PM EST -
DelayHaverhill Line Train 297 (5:55 pm from North Station) has departed North Station and is operating 5-15 minutes behind schedule.Affected direction:
OutboundUpdated: 11/18/2024 6:06 PM EST -
DelayHaverhill Line Train 218 (5:32 pm from Bradford) is operating 5-15 minutes behind schedule between Ballardvale and North Station.Affected direction:
InboundUpdated: 11/18/2024 6:03 PM EST -
Schedule ChangeThe new Fall/Winter schedule is now in effect on all lines with seasonal and on-time performance adjustments. Schedules are available online at MBTA.com/cr and will be available in hub stations soon.-The ski train will be back on the Fitchburg Line. Wachusett Mountain ski area operates a shuttle between the ski area and Wachusett station during Winter months to connect to these trains which feature a specifically modified coach equipped with racks for ski and snowboard equipment. Update to when the Ski Trains will be in effect will come out soon.
-Holiday service:
On Thursday, November 28th, 2024 (Thanksgiving Day), Friday, November 29th, 2024 (Day after Thanksgiving), Wednesday, December 25th, 2024 (Christmas Day), Wednesday, January 1st, 2025 (New Year’s Day), and Monday, February 17th, 2025 (President’s Day) all lines will operate on a weekend schedule. On Monday, January 20th, 2025 (Martin Luther King Jr. Day), and Monday, April 21st, 2025 (Patriot’s Day), all lines will operate on a regular weekday schedule.
Affected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/18/2024 3:00 AM EST -
Parking IssueThe Oak Grove Station Parking Lot will have reduced parking from Tuesday, Nov 12, through Monday, Mar 31, 2025, due to construction. Alternative parking is available at Wellington and/or Station Landing Garage (levels 6-8).
-
Parking Closure UpcomingThe Malden Center parking lot will be closed on Friday Dec 6 and Monday Dec 9 (full day closure) due to construction.Alternate Parking is available at Wellington or Oak Grove.
Parking Lot Reopens:
Tuesday, December 10, 2024Updated: 11/14/2024 11:33 AM EST -
Elevator Closure OngoingOak Grove Elevator 800 (Busway, Commuter Rail, parking lot to lobby) unavailable due to maintenanceTo exit, upon exiting the faregates, turn left and proceed to Oak Grove Elevator 745 to access the busway and parking lot. To board, proceed to the station entrance located near the busway and use Oak Grove Elevator 745 to access the lobby. Alternatively, customers may utilize Oak Grove Elevator 744 (Lobby to Washington St.) located at the entrance on Washington St.Updated: 9/26/2024 10:30 AM EDT
-
Escalator Closure OngoingOak Grove Escalator 105 (Commuter Rail platform to unpaid lobby) unavailable