Framingham/​Worcester
Filter by type
Alerts
-
DelayWorcester Line Train 530 (5:45 pm from Worcester) has departed Worcester and is operating 25-35 minutes behind schedule due to an earlier unruly passenger.Affected direction:
InboundUpdated: 3/6/2025 6:12 PM EST -
Track ChangePlease board all inbound Framingham Line trains on the outbound platform (Track 1) at Framingham through Wellesley Farms until 8:00 pm.Affected stops:
Framingham
West Natick
Natick Center
Wellesley Square
Wellesley Hills
Wellesley FarmsUpdated: 3/6/2025 1:59 PM EST -
Track ChangePlease board all outbound Worcester/Framingham Line trains on the inbound platform (Track 2) at Wellesley Farms through Framingham until 8:00 pm.Affected stops:
Wellesley Farms
Wellesley Hills
Wellesley Square
Natick Center
West Natick
FraminghamUpdated: 3/6/2025 2:00 PM EST -
Track ChangePlease board all inbound Worcester Line trains on the outbound platform (Track 1) at West Natick through Wellesley Farms until 8:00 pm.Affected stops:
West Natick
Natick Center
Wellesley Hills
Wellesley Square
Wellesley FarmsUpdated: 3/6/2025 2:01 PM EST -
Track ChangePlease board Worcester Line Train 529 (5:30 pm from South Station) on the outbound platform (Track 1) at West Natick and Framingham.Affected direction:
Outbound
Affected stops:
West Natick
FraminghamUpdated: 3/6/2025 5:33 PM EST -
Track ChangePlease board Worcester Line Train 532 (6:35 pm from Worcester) on the inbound platform (Track 2) at West Natick through Wellesley Farms.Affected direction:
Inbound
Affected stops:
West Natick
Natick Center
Wellesley Square
Wellesley Hills
Wellesley FarmsUpdated: 3/6/2025 6:13 PM EST -
DelayWorcester Line Train 528 (4:30 pm from Worcester) is operating 15-25 minutes behind schedule between Newtonville and South Station due to an earlier unruly passenger on a train ahead.Affected direction:
InboundUpdated: 3/6/2025 5:31 PM EST -
DelayFramingham Line Train 594 (5:20 pm from Framingham) is operating 15-25 minutes behind schedule between Natick Center and Framingham.Affected direction:
InboundUpdated: 3/6/2025 5:51 PM EST -
DelayWorcester Line Train 529 (5:30 pm from South Station) is operating 5-15 minutes behind schedule between Ashland and Worcester.Affected direction:
OutboundUpdated: 3/6/2025 6:23 PM EST -
DelayFramingham Line Train 592 (4:40 pm from Framingham) is operating 10-20 minutes behind schedule between Natick Center and South Station due to a medical emergency.Affected direction:
InboundUpdated: 3/6/2025 5:09 PM EST -
DelayWorcester Line Train 525 (4:00 pm from South Station) is operating 40-50 minutes behind schedule between Ashland and Worcester due to an unruly passenger.Affected direction:
OutboundUpdated: 3/6/2025 5:33 PM EST -
DelayWorcester Line Train 527 (4:45 pm from South Station) is operating 15-25 minutes behind schedule between Ashland and Worcester due to train traffic.Affected direction:
OutboundUpdated: 3/6/2025 5:50 PM EST -
Service Change UpcomingThe new Spring/Summer 2025 schedule will take effect on all Commuter Rail lines on Monday, March 24, 2025. PDFs are available on each line's page. Schedule will be available soon on the MBTA website. MBTA.com/schedules/commuter-railSpring/Summer 2025 PDF schedules are available for viewing and download on each line's webpage.Updated: 3/6/2025 5:08 PM EST
-
Station IssueThere is no accessible path connecting the inbound and outbound platforms at Wellesley Square Station. The existing path includes steep slopes and is long. Designs are underway to provide for a fully compliant pathway. MBTA.com/stops/place-WML-0147There are accessible mini-high platforms at the Western end of both the Track 1 and Track 2 sides. However, the existing pedestrian path between the two sides is long and includes steep slopes, especially on the Crest Road bridge over the tracks. Designs are underway to provide for a fully compliant pathway.Updated: 2/28/2025 2:31 PM EST
-
Station Issue OngoingEffective until further notice, the entrances to Natick Center station are relocated to Washington Street for access to the inbound and outbound platforms. MBTA.com/natickcenterNorth Avenue entrance and Walnut Street entrance will remain closed until further notice.
This access change will allow for work on the new platforms as part of Natick Center Station Accessibility Improvements Project.Updated: 2/3/2025 11:17 AM EST -
Escalator ClosureBack Bay Escalator 142 (Commuter Rail tracks 1 and 3 to lobby) unavailable due to maintenance
-
Bike Issue OngoingSouth Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. MBTA.com/projects/south-station-transportation-center-improvements
-
Parking Issue OngoingThe Upper Parking Lot at Worcester Station is closed with the exception to accessible parking, due to construction. MBTA.com/UnionStation