Skip to main content

Kingston/​Plymouth

Service Alerts For Kingston/Plymouth Line Close
  • Station Issue (Ongoing)
    The pedestrian bridge at the Braintree Parking Garage will be closed through Summer 2020 due to construction.

    For access to Braintree Station during this closure, travel down to the first floor and use the pedestrian crosswalk to enter the station at the street level.
    This closure is due to the South Shore Parking Garages Improvements and Renovations Project. The pedestrian bridge will be replaced by a new garage lobby featuring elevators and stairwells.

    Affected routes:
    Red Line
    210
    230
    236
    Middleborough/Lakeville Line
    Kingston/Plymouth Line
    Last Updated: 11/22/2017 12:55P
Station Issue: The pedestrian bridge at the Braintree Parkin… Station Issue: The pedestrian bridge at the Braintree Parking Garage will be closed through Summer 202… Station Issue: The pedestrian bridge at the Braintree Parking Garage will be closed through Summer 2020 due to construction. Station Issue: The pedestrian bridge at the Braintree Parking Garage will be closed through Summer 2020 due to construction. Station Issue: The pedestrian bridge at the Braintree Parking Garage will be closed through Summer 2020 due to construction. View


Departure
Train
Outbound to Refresh
Trip Information
Stops:
Times:
06:15P
live
Kingston/Plymouth Line
06:33P
06:32P
live
Kingston/Plymouth Line
06:40P
06:39P
live
Kingston/Plymouth Line
06:45P
06:44P
live
Kingston/Plymouth Line
06:48P
06:47P
live
Kingston/Plymouth Line
06:53P
06:52P
live
Kingston/Plymouth Line
06:58P
06:57P
live
Kingston/Plymouth Line
07:11P
07:10P
live
07:37P
07:36P
live
Trip duration: 9 stops; 81 minutes
Fare: $11.50 (View fares)
Show all trips for today