Red Line Hi-Rail Access Tunnel Project

Construction workers use an excavator to move new tracks

We're building a hi-rail access tunnel for work vehicles along the Red Line. A hi-rail vehicle is a work truck equipped with a hydraulic set of train wheels in addition to rubber tires allowing it to operate on railways and surface streets. Right now, the only access tunnel for these vehicles is at Charles/MGH station. The new tunnel will enable shorter and less frequent Red Line shutdowns, faster commutes, and bring the MBTA closer to a state of good repair.

  • Design contract awarded: February 2024
  • Construction start: June 2026
  • Projected completion: March 2028
  • Budget: $32.9 million
  • Status: 75% design

Building a Better T

As part of our $9.6 billion, 5-year capital investment plan, we're renovating stations, modernizing fare collection systems, upgrading services for our buses, subways, and ferries, and improving the accessibility of the entire system.

Learn more

Project Features

  • Additional Red Line tunnel access point in North Cambridge for construction vehicles
  • Paved access road
  • Updated pedestrian pathway

Rider Benefits

  • Shorter and less frequent Red Line shutdowns and shuttle bus diversions
  • Improved service reliability
  • Faster commutes
  • Reduced carbon emissions due to shorter travel distances for work trains

Neighborhood Impacts

Noise and vibration from construction and impacts to local traffic will be minimal.  

Environmental Impacts

The soil at the construction site is contaminated with asbestos, semi-volatile organic compounds, and potentially metals. To keep the surrounding neighborhood safe during construction, crews will:

Plan documents have been sent to the MassDEP Northeast Regional Office and are available on the MassDEP data portal.

View the MassDEP data portal

The site is also within 100 feet of wetlands and has a 1% chance of flooding in any given year. Therefore, we will submit a Notice of Intent (NOI) for approval by the Cambridge Conservation Commission.

Past Events

View all events

Contact Us

For questions or comments related the project, send an email to RedLineHiRailTunnel@MBTA.com.

Building a Better T

As part of our $9.6 billion, 5-year capital investment plan, we're renovating stations, modernizing fare collection systems, upgrading services for our buses, subways, and ferries, and improving the accessibility of the entire system.

Learn more