As part of our $8 billion, 5-year capital investment plan that began July 1, 2018, we are rebuilding and transforming the Green Line. 
Teaser Image
four photos: two construction workers tamping down tracks, a person in a hard hat directing a person in a wheelchair, a new green line train, and a green line trolley car full of riders heading to Park Street
four photos: two construction workers tamping down tracks, a person in a hard hat directing a person in a wheelchair, a new green line train, and a green line trolley car full of riders heading to Park Street

The Green Line Program is upgrading service on the T’s most popular light rail line.

This program will improve reliability and quality of service for riders and communities served by this line. Achieving this requires major upgrades to tracks, signals, stations, facilities and vehicles.

Paragraphs
Right Rail
Yes
Custom HTML Body

Building a Better T

As part of our $9.6 billion, 5-year capital investment plan, we're renovating stations, modernizing fare collection systems, upgrading services for our buses, subways, and ferries, and improving the accessibility of the entire system.

Learn more

Right Rail
No
Custom HTML Body

All Green Line Projects

Project Location Status
Green Line Train Protection System (GLTPS) {{icon:subway-green}} Systemwide {{fa "wrench"}} In progress
Hynes Station
Accessibility Improvements
{{icon:subway-green-b}} {{icon:subway-green-c}} {{icon:subway-green-d}} {{fa "wrench" }} In progress
Solar-Powered E Ink Signs {{icon:subway-green-b}} {{icon:subway-green-c}} {{icon:subway-green-e}} {{fa "wrench"}} In progress
D Branch Station Accessibility Improvements {{icon:subway-green-d}} {{fa "wrench"}} In progress
Newton Highlands Station
Accessibility Improvements
{{icon:subway-green-d}} {{fa "wrench"}} In progress
Symphony Station
Accessibility Improvements
{{icon:subway-green-e}} {{fa "wrench"}} In progress
B Branch Track Upgrades (2023) {{icon:subway-green-b}} {{fa "check"}} Complete
Green Line Track Upgrades (2022) {{icon:subway-green-b}} {{icon:subway-green-c}} {{icon:subway-green-d}} {{icon:subway-green-e}} {{fa "check"}} Complete
Lechmere Viaduct Rehabilitation {{icon:subway-green-e}} {{fa "check"}} Complete
Brookline Hills Station
Accessibility Improvements
{{icon:subway-green-d}} {{fa "check"}} Complete
D Branch Track and
Signal Replacement
{{icon:subway-green-d}} {{fa "check"}} Complete
B Branch Station Consolidation {{icon:subway-green-b}} {{fa "check"}} Complete
New Green Line Vehicles {{icon:subway-green}} Systemwide {{fa "check"}} Complete
Track and Intersection Upgrades (2021) {{icon:subway-green-b}} {{icon:subway-green-e}} {{fa "check"}} Complete
Track and Intersection Upgrades (2020) {{icon:subway-green-b}} {{icon:subway-green-c}} {{icon:subway-green-e}} {{fa "check"}} Complete
Track and Intersection Upgrades (2019) {{icon:subway-green-b}} {{icon:subway-green-c}} {{icon:subway-mattapan}} {{fa "check }} Complete
Fenway Portal Flood Protection {{icon:subway-green-d}} {{fa "check"}} Complete
Header Text

Levels of Transformation

The Green Line Program portfolio of projects is aligned by multiple Levels of Transformation, including:

Improved Safety and State of Good Repair
Right Rail
No
Custom HTML Body

We will upgrade infrastructure to lower the risk of high-impact events such as:

  • Collisions: A new train protection system
  • Derailments: Track and rail upgrades
  • Flooding: Water pumps and steel doors at Fenway Portal

These infrastructure upgrades will also have the following benefits:

  • Improve on-time performance to up to 90%
  • Remove speed restrictions by upgrading tracks and signals

Projects with this goal include:

  • D Branch Track and Signal Replacement
  • Fenway Portal Flood Protection
  • 2019, 2020, and 2021 Track and Intersection Upgrades
  • Green Line Train Protection System (GLTPS)
Enhanced Accessibility
Right Rail
No
Custom HTML Body

We will remove barriers to access at our stations and on our vehicles:

  • Improve accessibility of Green Line stations
  • Introduce new vehicles with low-floor entry

Projects with this goal include:

  • Newton Highlands, Symphony, Hynes, Brookline Hills, and D Branch Station Accessibility Improvements
  • New Green Line Vehicles
  • Green Line Extension
  • 2019, 2020, and 2021 Track and Intersection Upgrades
  • B Branch Station Consolidation
Increased Passenger Capacity
Right Rail
No
Custom HTML Body

We will provide faster service for more people:

  • Increase capacity by as much as 20,000 riders per hour
  • Reduce boarding times at street-level stops
  • Increase service frequency to less than 5 minutes between each train
  • Reduce travel times with centralized digital signals and transit signal priority

Projects with this goal include:

  • New Green Line Vehicles
  • Green Line Extension
  • B Branch Station Consolidation
Modernized Rider Experience
Right Rail
No
Custom HTML Body

We will upgrade stations, remove barriers to access, and make them easier to navigate:

  • Reduce service delays with new, upgraded vehicles
  • New shelters, walkways, and lighting so customers are safer and more comfortable
  • Upgrade signs so stations are easier to navigate
  • Provide real-time train arrival times at all Green Line stations

Projects with this goal include:

  • New Green Line Vehicles
  • Newton Highlands, Symphony, Hynes, Brookline Hills, and D Branch Station Accessibility Improvements
  • Solar-Powered E Ink Signs
  • Green Line Extension
  • B Branch Station Consolidation
Right Rail
Off
Header Text

Upcoming Events

Number of Items
5
Date Logic
Upcoming
Content Type
Events
Tags
GLP
Sorted By
Start time (events)
Order
Ascending
CTA Behavior
Hide (don't show a link)

Content List

Right Rail
Off
Header Text

Past Events

Number of Items
4
Date Logic
Past
Content Type
Events
Tags
GLP
Sorted By
Start time (events)
Order
Descending

Content List

Right Rail
No
Custom HTML Body

Contact Information

For all queries and comments related to the Green Line Program, please contact GLT@mbta.com.

To report construction issues or noise complaints, please call the project hotline: 617-222-4100.

Right Rail
On
Number of Items
5
Content Type
Projects
Relationship
3. Show only the selected page below

Content List

Project Status
In progress
Updated On
Keywords
GLT GLX
Page Type