Skip to main content
Menu

Dorchester Ave Bridge Replacement Virtual Public Meeting

Meeting Info

Date: March 25, 2021 at 6 PM - 7:30 PM

Location: Virtual • Zoom • Boston, MA

Attendees: General Public

Event Description

Design is underway to replace the Dorchester Avenue Bridge, located between Von Hillern Street and Kemp Street. The steel bridge carries vehicles, pedestrians, and bicyclists over the Red Line as well as the Old Colony Commuter Rail and Cabot Yard maintenance tracks. Work is also set to begin on the Von Hillern Street retaining wall, which is in need of repair.

Please join the MBTA Dorchester Avenue Bridge project team for an online public meeting, where the team will present the project overview, schedule, and bridge design, as well as updates on the retaining wall repair work.

Agenda

The project team will begin with a presentation at 6:00pm, followed by time for questions and answers.

Join the Virtual Meeting

Webinar ID: 884 8404 2983

Or join by telephone: 929-205-6099

The meeting will be recorded and posted for those who cannot attend. Comments can also be sent to the project team at DotAveBridge@MBTA.com.

Accommodations

These meetings are accessible to people with disabilities and those with limited English proficiency. Accessibility accommodations and language services will be provided free of charge, upon request, as available. Such services include documents in alternate formats, translated materials, assistive listening devices, and interpreters (including American Sign Language).

For accommodation or language assistance, please contact MassDOT’s Chief Diversity and Civil Rights Officer by phone (857-368-8580), fax (857-368-0602), TTD/TTY (857-368-0603) or by email at MASSDOT.CivilRights@dot.state.ma.us.