Haverhill
Filter by type
Alerts
-
Schedule ChangeJuly 15, 2024, through the Summer of 2025, buses will replace regular weekday & weekend train service between Haverhill & Bradford to accommodate the South Elm Bridge replacement project. A new Haverhill Line Construction Schedule will soon be available.Built in 1906, the South Elm Bridge is beyond its useful life and ready to be replaced. Using accelerated bridge construction techniques to reduce customer and traffic impacts, the MBTA will replace the nearly-120-year-old bridge with a modern single-span structure with a useful life of 75 years. The new structure will include a ballasted steel deck, which means a smoother ride for passengers. The MBTA will also perform roadway, sidewalk, and drainage improvements along South Elm Street.Updated: 6/5/2024 12:06 PM EDT
-
DelayHaverhill Line Train 280 (4:51 am from Lawrence) is operating 25-35 minutes behind schedule between North Wilmington and North Station due to a signal issue.Affected direction:
Inbound
Affected stops:
Andover
Ballardvale
North Wilmington
Reading
Malden Center
North Station
Wakefield
Greenwood
Melrose Highlands
Melrose/Cedar Park
Wyoming Hill
Oak GroveUpdated: 6/10/2024 5:44 AM EDT -
DelayHaverhill Line Train 200 (5:27 am from Haverhill) is operating 5-15 minutes behind schedule between Wakefield and North Station due to a signal issue.Affected direction:
Inbound
Affected stops:
Andover
Ballardvale
North Wilmington
Reading
Bradford
Malden Center
North Station
Anderson/Woburn
Wakefield
Greenwood
Melrose Highlands
Melrose/Cedar Park
Wyoming Hill
Oak GroveUpdated: 6/10/2024 6:24 AM EDT -
DelayHaverhill Line Train 201 (5:55 am from North Station) is operating 5-15 minutes behind schedule between North Station and Haverhill due to train traffic.Affected direction:
OutboundUpdated: 6/10/2024 6:17 AM EDT -
DelayHaverhill Line Train 202 (6:12 am from Haverhill) is operating 10-20 minutes behind schedule between Lawrence and North Station due to a signal issue.Affected direction:
InboundUpdated: 6/10/2024 6:43 AM EDT -
Track ChangePlease board all Haverhill Line trains on the inbound platform (Track 2) at Wakefield and Greenwood stations until further notice.Affected stops:
Greenwood
WakefieldUpdated: 5/28/2024 11:22 AM EDT -
Elevator ClosureOak Grove Elevator 800 (Busway, Commuter Rail, parking lot to lobby) unavailable due to maintenanceTo exit, upon exiting the faregates, turn left and proceed to Oak Grove Elevator 745 to access the busway and parking lot. To board, proceed to the station entrance located near the busway and use Oak Grove Elevator 745 to access the lobby. Alternatively, customers may utilize Oak Grove Elevator 744 (Lobby to Washington St.) located at the station entrance on Washington St.Updated: 3/15/2023 4:43 PM EDT