Haverhill
-
Station ClosureCommuter Rail train service is suspended at Haverhill station through Summer 2025 to allow for work on the South Elm Street Bridge. An accessible van operates between Haverhill and Bradford.Built in 1906, the South Elm Bridge is beyond its useful life and ready to be replaced. Using accelerated bridge construction techniques to reduce customer and traffic impacts, the MBTA will replace the nearly-120-year-old bridge with a modern single-span structure with a useful life of 75 years. The new structure will include a ballasted steel deck, which means a smoother ride for passengers. The MBTA will also perform roadway, sidewalk, and drainage improvements along South Elm Street.Updated: 7/23/2024 10:13 AM EDT
Upcoming Holidays
- No upcoming holidays
Weekends
Today
December 2027 | ||||||
Sun | Mon | Tue | Wed | Thu | Fri | Sat |
---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | |||
5 | 6 | 7 | 8 | 9 | 10 | 11 |
12 | 13 | 14 | 15 | 16 | 17 | 18 |
19 | 20 | 21 | 22 | 23 | 24 | 25 |
26 | 27 | 28 | 29 | 30 | 31 | 1 |
2 | 3 | 4 | 5 | 6 | 7 | 8 |
Weekends
Today
December 15, 2027 is outside of our current schedule.
We can only provide trip data for the Summer schedule, valid until August 24, 2024.
Icon Key
Bicycles are allowed on trains with the bicycle symbol below the train number, subject to restrictions.
Passengers must tell the conductor that they wish to leave. Passengers waiting to board
must be visible on the platform for the train to stop.
The train may leave ahead of schedule at these stops.
At stations with multiple tracks outside of North, South, Back Bay, and Ruggles Stations, inbound trains board from Track 2, and outbound trains board from Track 1 unless otherwise specified. Scheduled track changes will be denoted by the symbol. Check T-Alerts for real-time track changes.