Alerts
Filter by type
Get T-Alerts
Tell us about your regular trips and receive text or email alerts that are relevant to you, at times when you want them.
Create an Account Sign in-
DelayFranklin Line Train 728 (7:04 pm from Franklin) is operating 10-20 minutes behind schedule between Walpole and South Station.Affected direction:
InboundUpdated: 11/21/2024 7:50 PM EST -
Schedule ChangeThe new Fall/Winter schedule is now in effect on all lines with seasonal and on-time performance adjustments. Schedules are available online at MBTA.com/cr and will be available in hub stations soon.-The ski train will be back on the Fitchburg Line. Wachusett Mountain ski area operates a shuttle between the ski area and Wachusett station during Winter months to connect to these trains which feature a specifically modified coach equipped with racks for ski and snowboard equipment. Update to when the Ski Trains will be in effect will come out soon.
-Holiday service:
On Thursday, November 28th, 2024 (Thanksgiving Day), Friday, November 29th, 2024 (Day after Thanksgiving), Wednesday, December 25th, 2024 (Christmas Day), Wednesday, January 1st, 2025 (New Year’s Day), and Monday, February 17th, 2025 (President’s Day) all lines will operate on a weekend schedule. On Monday, January 20th, 2025 (Martin Luther King Jr. Day), and Monday, April 21st, 2025 (Patriot’s Day), all lines will operate on a regular weekday schedule.
Affected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/18/2024 3:00 AM EST -
Service Change UpcomingOn Thanksgiving Day, Thursday, November 28th and the day after Thanksgiving, Friday, November 29th, the Commuter Rail will be operating on a regular weekend schedule. MBTA.com/holidaysAffected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/21/2024 7:14 AM EST -
Service Change UpcomingOn Saturday, December 7th & Sunday, December 8th shuttle buses will replace regular train service between Forge Park/495 and Readville to allow for work on the East Street Bridge Replacement Project.This will allow for work on the East Street Bridge Replacement Project.
A diversion schedule will be in effect.
Affected trips:
2700 (5:17 am from Forge Park/495)
2700 (5:17 am from Forge Park/495)
1700 (5:17 am from Forge Park/495)
1700 (5:17 am from Forge Park/495)
1701 (6:47 am from South Station)
2701 (6:47 am from South Station)
2701 (6:47 am from South Station)
1701 (6:47 am from South Station)
2703 (8:02 am from South Station)
2703 (8:02 am from South Station)
1703 (8:02 am from South Station)
1703 (8:02 am from South Station)
1702 (8:17 am from Forge Park/495)
2702 (8:17 am from Forge Park/495)
2702 (8:17 am from Forge Park/495)
1702 (8:17 am from Forge Park/495)
1704 (9:47 am from Forge Park/495)
2704 (9:47 am from Forge Park/495)
2704 (9:47 am from Forge Park/495)
1704 (9:47 am from Forge Park/495)
2705 (10:17 am from South Station)
2705 (10:17 am from South Station)
1705 (10:17 am from South Station)
1705 (10:17 am from South Station)
1706 (11:47 am from Forge Park/495)
2706 (11:47 am from Forge Park/495)
2706 (11:47 am from Forge Park/495)
1706 (11:47 am from Forge Park/495)
1707 (12:17 pm from South Station)
2707 (12:17 pm from South Station)
2707 (12:17 pm from South Station)
1707 (12:17 pm from South Station)
1708 (1:47 pm from Forge Park/495)
2708 (1:47 pm from Forge Park/495)
2708 (1:47 pm from Forge Park/495)
1708 (1:47 pm from Forge Park/495)
1709 (2:17 pm from South Station)
2709 (2:17 pm from South Station)
2709 (2:17 pm from South Station)
1709 (2:17 pm from South Station)
1710 (3:47 pm from Forge Park/495)
1711 (3:47 pm from South Station)
2711 (3:47 pm from South Station)
2710 (3:47 pm from Forge Park/495)
2710 (3:47 pm from Forge Park/495)
2711 (3:47 pm from South Station)
1710 (3:47 pm from Forge Park/495)
1711 (3:47 pm from South Station)
1713 (5:47 pm from South Station)
2713 (5:47 pm from South Station)
2713 (5:47 pm from South Station)
1713 (5:47 pm from South Station)
1712 (5:57 pm from Forge Park/495)
2712 (5:57 pm from Forge Park/495)
2712 (5:57 pm from Forge Park/495)
1712 (5:57 pm from Forge Park/495)
1715 (7:55 pm from South Station)
2715 (7:55 pm from South Station)
2715 (7:55 pm from South Station)
1715 (7:55 pm from South Station)
1714 (7:57 pm from Forge Park/495)
2714 (7:57 pm from Forge Park/495)
2714 (7:57 pm from Forge Park/495)
1714 (7:57 pm from Forge Park/495)
1716 (9:27 pm from Forge Park/495)
2716 (9:27 pm from Forge Park/495)
2716 (9:27 pm from Forge Park/495)
1716 (9:27 pm from Forge Park/495)
1717 (9:55 pm from South Station)
2717 (9:55 pm from South Station)
2717 (9:55 pm from South Station)
1717 (9:55 pm from South Station)
1718 (11:27 pm from Forge Park/495)
2718 (11:27 pm from Forge Park/495)
2718 (11:27 pm from Forge Park/495)
1718 (11:27 pm from Forge Park/495)
1719 (11:55 pm from South Station)
2719 (11:55 pm from South Station)
2719 (11:55 pm from South Station)
1719 (11:55 pm from South Station)Updated: 11/18/2024 10:32 AM EST -
Bike Issue OngoingSouth Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. MBTA.com/projects/south-station-transportation-center-improvements
-
DelayFitchburg Line Train 427 (6:30 pm from North Station) has departed North Station and is operating 15-25 minutes behind schedule.Affected direction:
OutboundUpdated: 11/21/2024 7:04 PM EST -
DelayFitchburg Line Train 426 (6:15 pm from Wachusett) is operating 5-15 minutes behind schedule between West Concord and North Station.Affected direction:
InboundUpdated: 11/21/2024 7:15 PM EST -
Schedule ChangeThe new Fall/Winter schedule is now in effect on all lines with seasonal and on-time performance adjustments. Schedules are available online at MBTA.com/cr and will be available in hub stations soon.-The ski train will be back on the Fitchburg Line. Wachusett Mountain ski area operates a shuttle between the ski area and Wachusett station during Winter months to connect to these trains which feature a specifically modified coach equipped with racks for ski and snowboard equipment. Update to when the Ski Trains will be in effect will come out soon.
-Holiday service:
On Thursday, November 28th, 2024 (Thanksgiving Day), Friday, November 29th, 2024 (Day after Thanksgiving), Wednesday, December 25th, 2024 (Christmas Day), Wednesday, January 1st, 2025 (New Year’s Day), and Monday, February 17th, 2025 (President’s Day) all lines will operate on a weekend schedule. On Monday, January 20th, 2025 (Martin Luther King Jr. Day), and Monday, April 21st, 2025 (Patriot’s Day), all lines will operate on a regular weekday schedule.
Affected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/18/2024 3:00 AM EST -
Service Change UpcomingOn Thanksgiving Day, Thursday, November 28th and the day after Thanksgiving, Friday, November 29th, the Commuter Rail will be operating on a regular weekend schedule. MBTA.com/holidaysAffected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/21/2024 7:14 AM EST -
Service Change UpcomingOn the weekends of November 23-24, December 7-8, 14-15, and all-day Friday, December 6th, shuttle buses will replace regular train service between Wachusett and North Leominster to allow for signal improvement work.
-
Service Change OngoingEffective until further notice, the entrances to Natick Center station are relocated to Washington Street for access to the inbound and outbound platforms. MBTA.com/natickcenterNorth Avenue entrance and Walnut Street entrance will remain closed until further notice.
This access change will allow for work on the new platforms as part of Natick Center Station Accessibility Improvements Project.Updated: 6/22/2024 5:58 PM EDT -
DelayWorcester Line Train 532 (6:35 pm from Worcester) has departed Worcester and is operating 20-30 minutes behind schedule due to an earlier road vehicle on the right of way.Affected direction:
InboundUpdated: 11/21/2024 7:09 PM EST -
Track ChangePlease board all outbound Framingham/Worcester Line trains on the inbound platform (Track 2) at Wellesley Farms through Framingham until 8:00pm.Affected direction:
Outbound
Affected stops:
Wellesley Farms
Wellesley Hills
Wellesley Square
Natick Center
West Natick
FraminghamUpdated: 11/21/2024 2:11 PM EST -
Track ChangePlease board all inbound Worcester Line trains on the outbound platform (Track 1) at West Natick through Wellesley Farms until 8:00 pm.Affected direction:
Inbound
Affected stops:
West Natick
Natick Center
Wellesley Square
Wellesley Hills
Wellesley FarmsUpdated: 11/21/2024 2:12 PM EST -
Track ChangePlease board all inbound Framingham Line trains on the outbound platform (Track 1) at Framingham through Wellesley Farms until 8:00pm.Affected direction:
Inbound
Affected stops:
Framingham
West Natick
Natick Center
Wellesley Square
Wellesley Hills
Wellesley FarmsUpdated: 11/21/2024 2:12 PM EST -
Track ChangeCorrection: Please board Worcester Line Train 529 (5:30pm from South Station) on the inbound platform (Track 2) at West Natick through Framingham.Affected direction:
Outbound
Affected stops:
West Natick
FraminghamUpdated: 11/21/2024 5:56 PM EST -
Schedule ChangeThe new Fall/Winter schedule is now in effect on all lines with seasonal and on-time performance adjustments. Schedules are available online at MBTA.com/cr and will be available in hub stations soon.-The ski train will be back on the Fitchburg Line. Wachusett Mountain ski area operates a shuttle between the ski area and Wachusett station during Winter months to connect to these trains which feature a specifically modified coach equipped with racks for ski and snowboard equipment. Update to when the Ski Trains will be in effect will come out soon.
-Holiday service:
On Thursday, November 28th, 2024 (Thanksgiving Day), Friday, November 29th, 2024 (Day after Thanksgiving), Wednesday, December 25th, 2024 (Christmas Day), Wednesday, January 1st, 2025 (New Year’s Day), and Monday, February 17th, 2025 (President’s Day) all lines will operate on a weekend schedule. On Monday, January 20th, 2025 (Martin Luther King Jr. Day), and Monday, April 21st, 2025 (Patriot’s Day), all lines will operate on a regular weekday schedule.
Affected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/18/2024 3:00 AM EST -
Service Change UpcomingOn Thanksgiving Day, Thursday, November 28th and the day after Thanksgiving, Friday, November 29th, the Commuter Rail will be operating on a regular weekend schedule. MBTA.com/holidaysAffected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/21/2024 7:14 AM EST -
Service Change OngoingEffective on weekdays from 9:00 am - 3:00 pm, from Monday October 7th through Friday December 20th, at Worcester Union Station, boarding will occur from the tracks adjacent to the 45 Shrewsbury Street parking lot.Affected stops:
WorcesterUpdated: 11/6/2024 9:48 AM EST -
Elevator Closure UpcomingLansdowne Elevator 990 (Street to Track 5 (South Station platform) and bridge) unavailable from Fri Nov 22 through Sat Nov 23 due to maintenance
-
Elevator Closure UpcomingLansdowne Elevator 991 (Track 5 (South Station platform) to bridge) unavailable from Sat Nov 23 through Sun Nov 24 due to maintenance
-
Bike Issue OngoingSouth Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. MBTA.com/projects/south-station-transportation-center-improvements
-
Parking Issue OngoingThe Upper Parking Lot at Worcester Station is closed with the exception to accessible parking, due to construction. MBTA.com/UnionStation
-
DelayFoxboro Line Train 756 (6:48 pm from Foxboro) has departed Foxboro and is operating 20-30 minutes behind schedule due to earlier fire department activity in the Dedham area.Affected direction:
InboundUpdated: 11/21/2024 7:13 PM EST -
DelayProvidence Line Train 834 (6:46 pm from Wickford Junction) has departed Wickford Junction and is operating 15-25 minutes behind schedule due to earlier fire department activity.Affected direction:
InboundUpdated: 11/21/2024 7:08 PM EST -
DelayFranklin Line Train 728 (7:04 pm from Franklin) is operating 10-20 minutes behind schedule between Walpole and South Station.Affected direction:
InboundUpdated: 11/21/2024 7:50 PM EST -
DelayFranklin Line Train 729 (6:35 pm from South Station) is operating 15-25 minutes behind schedule between Norwood Depot and Forge Park/495.Affected direction:
OutboundUpdated: 11/21/2024 7:30 PM EST -
Schedule ChangeThe new Fall/Winter schedule is now in effect on all lines with seasonal and on-time performance adjustments. Schedules are available online at MBTA.com/cr and will be available in hub stations soon.-The ski train will be back on the Fitchburg Line. Wachusett Mountain ski area operates a shuttle between the ski area and Wachusett station during Winter months to connect to these trains which feature a specifically modified coach equipped with racks for ski and snowboard equipment. Update to when the Ski Trains will be in effect will come out soon.
-Holiday service:
On Thursday, November 28th, 2024 (Thanksgiving Day), Friday, November 29th, 2024 (Day after Thanksgiving), Wednesday, December 25th, 2024 (Christmas Day), Wednesday, January 1st, 2025 (New Year’s Day), and Monday, February 17th, 2025 (President’s Day) all lines will operate on a weekend schedule. On Monday, January 20th, 2025 (Martin Luther King Jr. Day), and Monday, April 21st, 2025 (Patriot’s Day), all lines will operate on a regular weekday schedule.
Affected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/18/2024 3:00 AM EST -
Service Change UpcomingOn Thanksgiving Day, Thursday, November 28th and the day after Thanksgiving, Friday, November 29th, the Commuter Rail will be operating on a regular weekend schedule. MBTA.com/holidaysAffected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/21/2024 7:14 AM EST -
Service Change UpcomingOn Saturday, December 7th & Sunday, December 8th shuttle buses will replace regular train service between Forge Park/495 and Readville to allow for work on the East Street Bridge Replacement Project.This will allow for work on the East Street Bridge Replacement Project.
A diversion schedule will be in effect.
Affected trips:
2700 (5:17 am from Forge Park/495)
2700 (5:17 am from Forge Park/495)
1700 (5:17 am from Forge Park/495)
1700 (5:17 am from Forge Park/495)
1701 (6:47 am from South Station)
2701 (6:47 am from South Station)
2701 (6:47 am from South Station)
1701 (6:47 am from South Station)
2703 (8:02 am from South Station)
2703 (8:02 am from South Station)
1703 (8:02 am from South Station)
1703 (8:02 am from South Station)
1702 (8:17 am from Forge Park/495)
2702 (8:17 am from Forge Park/495)
2702 (8:17 am from Forge Park/495)
1702 (8:17 am from Forge Park/495)
1704 (9:47 am from Forge Park/495)
2704 (9:47 am from Forge Park/495)
2704 (9:47 am from Forge Park/495)
1704 (9:47 am from Forge Park/495)
2705 (10:17 am from South Station)
2705 (10:17 am from South Station)
1705 (10:17 am from South Station)
1705 (10:17 am from South Station)
1706 (11:47 am from Forge Park/495)
2706 (11:47 am from Forge Park/495)
2706 (11:47 am from Forge Park/495)
1706 (11:47 am from Forge Park/495)
1707 (12:17 pm from South Station)
2707 (12:17 pm from South Station)
2707 (12:17 pm from South Station)
1707 (12:17 pm from South Station)
1708 (1:47 pm from Forge Park/495)
2708 (1:47 pm from Forge Park/495)
2708 (1:47 pm from Forge Park/495)
1708 (1:47 pm from Forge Park/495)
1709 (2:17 pm from South Station)
2709 (2:17 pm from South Station)
2709 (2:17 pm from South Station)
1709 (2:17 pm from South Station)
1710 (3:47 pm from Forge Park/495)
1711 (3:47 pm from South Station)
2711 (3:47 pm from South Station)
2710 (3:47 pm from Forge Park/495)
2710 (3:47 pm from Forge Park/495)
2711 (3:47 pm from South Station)
1710 (3:47 pm from Forge Park/495)
1711 (3:47 pm from South Station)
1713 (5:47 pm from South Station)
2713 (5:47 pm from South Station)
2713 (5:47 pm from South Station)
1713 (5:47 pm from South Station)
1712 (5:57 pm from Forge Park/495)
2712 (5:57 pm from Forge Park/495)
2712 (5:57 pm from Forge Park/495)
1712 (5:57 pm from Forge Park/495)
1715 (7:55 pm from South Station)
2715 (7:55 pm from South Station)
2715 (7:55 pm from South Station)
1715 (7:55 pm from South Station)
1714 (7:57 pm from Forge Park/495)
2714 (7:57 pm from Forge Park/495)
2714 (7:57 pm from Forge Park/495)
1714 (7:57 pm from Forge Park/495)
1716 (9:27 pm from Forge Park/495)
2716 (9:27 pm from Forge Park/495)
2716 (9:27 pm from Forge Park/495)
1716 (9:27 pm from Forge Park/495)
1717 (9:55 pm from South Station)
2717 (9:55 pm from South Station)
2717 (9:55 pm from South Station)
1717 (9:55 pm from South Station)
1718 (11:27 pm from Forge Park/495)
2718 (11:27 pm from Forge Park/495)
2718 (11:27 pm from Forge Park/495)
1718 (11:27 pm from Forge Park/495)
1719 (11:55 pm from South Station)
2719 (11:55 pm from South Station)
2719 (11:55 pm from South Station)
1719 (11:55 pm from South Station)Updated: 11/18/2024 10:32 AM EST -
Station IssueIslington Station parking will be closed starting at 8:00 pm on Wednesday, November 20th and will reopen on Friday, November 22nd. All vehicles in the lot after 8:00 pm on 11/20 will be towed at the owner's expense.Affected lines:
Franklin/Foxboro LineUpdated: 11/21/2024 12:00 AM EST -
Station IssueBeginning the morning of Mon, Nov 18th through Fri Nov 22nd, the stairway entrance at Franklin will be temporarily blocked to allow for necessary maintenance. Passengers can access the station through the parking lot using the entrance on Depot Street.Affected lines:
Franklin/Foxboro LineUpdated: 11/18/2024 9:48 AM EST -
Parking ClosureThe Islington parking lot will be closed on Wednesday Nov 20 and Thursday Nov 21 (full day closure) due to construction.Alternative Parking at Norwood Depot
Parking Lot Reopens:
Friday, November 22, 2024Updated: 11/21/2024 12:00 AM EST -
Parking Closure UpcomingThe Walpole parking lot will be closed from Dec 3 - 6 (full day closure) due to construction. Vehicles left in the lot during these times will be relocated or towed at the vehicle owner’s expense.Alternative Parking at Spring Street and Elm Street Lots
Parking Lot Reopens:
Saturday, December 7, 2024Updated: 11/19/2024 6:07 PM EST -
Parking Closure UpcomingThe Franklin parking lot will be closed on Thursday Dec 5 and Saturday Dec 7 (full day closure) due to construction.Alternative Parking at Forge Park
Parking Lot Reopens:
Sunday, December 8, 2024Updated: 11/14/2024 11:31 AM EST -
Bike Issue OngoingSouth Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. MBTA.com/projects/south-station-transportation-center-improvements
-
Bike Issue OngoingThe door to enter the Forest Hills Pedal and Park is not functioning. We are working to have it addressed as quickly as possible,
-
Schedule ChangeThe new Fall/Winter schedule is now in effect on all lines with seasonal and on-time performance adjustments. Schedules are available online at MBTA.com/cr and will be available in hub stations soon.-The ski train will be back on the Fitchburg Line. Wachusett Mountain ski area operates a shuttle between the ski area and Wachusett station during Winter months to connect to these trains which feature a specifically modified coach equipped with racks for ski and snowboard equipment. Update to when the Ski Trains will be in effect will come out soon.
-Holiday service:
On Thursday, November 28th, 2024 (Thanksgiving Day), Friday, November 29th, 2024 (Day after Thanksgiving), Wednesday, December 25th, 2024 (Christmas Day), Wednesday, January 1st, 2025 (New Year’s Day), and Monday, February 17th, 2025 (President’s Day) all lines will operate on a weekend schedule. On Monday, January 20th, 2025 (Martin Luther King Jr. Day), and Monday, April 21st, 2025 (Patriot’s Day), all lines will operate on a regular weekday schedule.
Affected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/18/2024 3:00 AM EST -
Service Change UpcomingOn Thanksgiving Day, Thursday, November 28th and the day after Thanksgiving, Friday, November 29th, the Commuter Rail will be operating on a regular weekend schedule. MBTA.com/holidaysAffected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/21/2024 7:14 AM EST -
Bike Issue OngoingSouth Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. MBTA.com/projects/south-station-transportation-center-improvements
-
Station Closure OngoingCommuter Rail train service is suspended at Haverhill station through Summer 2025 to allow for work on the South Elm Street Bridge. An accessible van operates between Haverhill and Bradford.Built in 1906, the South Elm Bridge is beyond its useful life and ready to be replaced. Using accelerated bridge construction techniques to reduce customer and traffic impacts, the MBTA will replace the nearly-120-year-old bridge with a modern single-span structure with a useful life of 75 years. The new structure will include a ballasted steel deck, which means a smoother ride for passengers. The MBTA will also perform roadway, sidewalk, and drainage improvements along South Elm Street.Updated: 7/30/2024 10:08 AM EDT
-
DelayHaverhill Line Train 220 (6:55 pm from Bradford) is operating 5-15 minutes behind schedule between Bradford and North Station.Affected direction:
InboundUpdated: 11/21/2024 7:16 PM EST -
Schedule ChangeThe new Fall/Winter schedule is now in effect on all lines with seasonal and on-time performance adjustments. Schedules are available online at MBTA.com/cr and will be available in hub stations soon.-The ski train will be back on the Fitchburg Line. Wachusett Mountain ski area operates a shuttle between the ski area and Wachusett station during Winter months to connect to these trains which feature a specifically modified coach equipped with racks for ski and snowboard equipment. Update to when the Ski Trains will be in effect will come out soon.
-Holiday service:
On Thursday, November 28th, 2024 (Thanksgiving Day), Friday, November 29th, 2024 (Day after Thanksgiving), Wednesday, December 25th, 2024 (Christmas Day), Wednesday, January 1st, 2025 (New Year’s Day), and Monday, February 17th, 2025 (President’s Day) all lines will operate on a weekend schedule. On Monday, January 20th, 2025 (Martin Luther King Jr. Day), and Monday, April 21st, 2025 (Patriot’s Day), all lines will operate on a regular weekday schedule.
Affected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/18/2024 3:00 AM EST -
Service Change UpcomingOn Thanksgiving Day, Thursday, November 28th and the day after Thanksgiving, Friday, November 29th, the Commuter Rail will be operating on a regular weekend schedule. MBTA.com/holidaysAffected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/21/2024 7:14 AM EST -
Parking Closure UpcomingThe Malden Center parking lot will be closed on Friday Dec 6 and Monday Dec 9 (full day closure) due to construction.Alternate Parking is available at Wellington or Oak Grove.
Parking Lot Reopens:
Tuesday, December 10, 2024Updated: 11/14/2024 11:33 AM EST -
Parking Issue OngoingThe Oak Grove Station Parking Lot will have reduced parking from Tuesday, Nov 12, through Monday, Mar 31, 2025, due to construction. Alternative parking is available at Wellington and/or Station Landing Garage (levels 6-8).
-
Elevator Closure OngoingOak Grove Elevator 800 (Busway, Commuter Rail, parking lot to lobby) unavailable due to maintenanceTo exit, upon exiting the faregates, turn left and proceed to Oak Grove Elevator 745 to access the busway and parking lot. To board, proceed to the station entrance located near the busway and use Oak Grove Elevator 745 to access the lobby. Alternatively, customers may utilize Oak Grove Elevator 744 (Lobby to Washington St.) located at the entrance on Washington St.Updated: 9/26/2024 10:30 AM EDT
-
Escalator Closure OngoingOak Grove Escalator 105 (Commuter Rail platform to unpaid lobby) unavailable
-
Schedule ChangeThe new Fall/Winter schedule is now in effect on all lines with seasonal and on-time performance adjustments. Schedules are available online at MBTA.com/cr and will be available in hub stations soon.-The ski train will be back on the Fitchburg Line. Wachusett Mountain ski area operates a shuttle between the ski area and Wachusett station during Winter months to connect to these trains which feature a specifically modified coach equipped with racks for ski and snowboard equipment. Update to when the Ski Trains will be in effect will come out soon.
-Holiday service:
On Thursday, November 28th, 2024 (Thanksgiving Day), Friday, November 29th, 2024 (Day after Thanksgiving), Wednesday, December 25th, 2024 (Christmas Day), Wednesday, January 1st, 2025 (New Year’s Day), and Monday, February 17th, 2025 (President’s Day) all lines will operate on a weekend schedule. On Monday, January 20th, 2025 (Martin Luther King Jr. Day), and Monday, April 21st, 2025 (Patriot’s Day), all lines will operate on a regular weekday schedule.
Affected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/18/2024 3:00 AM EST -
Service Change UpcomingOn Thanksgiving Day, Thursday, November 28th and the day after Thanksgiving, Friday, November 29th, the Commuter Rail will be operating on a regular weekend schedule. MBTA.com/holidaysAffected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/21/2024 7:14 AM EST -
Bike Issue OngoingSouth Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. MBTA.com/projects/south-station-transportation-center-improvements
-
Service Change OngoingWinchester Center station is now open for Commuter Rail service. The bus shuttle service between Winchester and Wedgemere has been phased out. Check the new Lowell Line schedule at North Station or at MBTA.com.Affected stops:
Winchester CenterUpdated: 10/8/2024 4:30 AM EDT -
Delay UpcomingOn weekdays, between 9:00 am and 4:00 pm, Lowell Line passengers may experience delays of 5-10 minutes in both directions as work progresses on the Winchester Center Station Accessibility Improvements Project. MBTA.com/winchesterstationAffected trips:
313 (9:20 am from North Station)
316 (10:22 am from Lowell)
317 (11:20 am from North Station)
320 (12:22 pm from Lowell)
321 (1:20 pm from North Station)
324 (2:22 pm from Lowell)
325 (3:07 pm from North Station)Updated: 11/19/2024 9:37 AM EST -
Schedule ChangeThe new Fall/Winter schedule is now in effect on all lines with seasonal and on-time performance adjustments. Schedules are available online at MBTA.com/cr and will be available in hub stations soon.-The ski train will be back on the Fitchburg Line. Wachusett Mountain ski area operates a shuttle between the ski area and Wachusett station during Winter months to connect to these trains which feature a specifically modified coach equipped with racks for ski and snowboard equipment. Update to when the Ski Trains will be in effect will come out soon.
-Holiday service:
On Thursday, November 28th, 2024 (Thanksgiving Day), Friday, November 29th, 2024 (Day after Thanksgiving), Wednesday, December 25th, 2024 (Christmas Day), Wednesday, January 1st, 2025 (New Year’s Day), and Monday, February 17th, 2025 (President’s Day) all lines will operate on a weekend schedule. On Monday, January 20th, 2025 (Martin Luther King Jr. Day), and Monday, April 21st, 2025 (Patriot’s Day), all lines will operate on a regular weekday schedule.
Affected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/18/2024 3:00 AM EST -
Service Change UpcomingOn Thanksgiving Day, Thursday, November 28th and the day after Thanksgiving, Friday, November 29th, the Commuter Rail will be operating on a regular weekend schedule. MBTA.com/holidaysAffected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/21/2024 7:14 AM EST -
Service Change UpcomingOn the weekends of November 23-24, December 7-8, and 21-22, an express shuttle and a local shuttle will replace regular weekend train service between Lowell and North Station to allow for track improvement work.There will be two shuttle buses, once with service to Lowell, North Billerica, and Wilmington with express service to and from North Station with an additional local bus making all stops between North Station and Wilmington (Anderson/Woburn, Wedgemere, and West Medford.)
There will be no shuttle bus service at Winchester Station. Passengers are encouraged to travel to Wedgemere for shuttle bus service.Updated: 11/18/2024 8:32 AM EST -
Service Change UpcomingOn the weekends of December 14-15, an express shuttle and a local shuttle will replace regular weekend train service between Lowell and Anderson/Woburn to allow for track improvement work.
-
Parking ClosureThe Wilmington parking lot will be closed on Thursday Nov 21 and Friday Nov 22 (full day closure) due to construction.Alternative Parking at Anderson/Woburn
Parking Lot Reopens:
Saturday, November 23, 2024Updated: 11/21/2024 2:30 AM EST
-
DelayMiddleborough Line Train 025 (7:05 pm from South Station) has departed South Station and is operating 15-25 minutes behind schedule.Affected direction:
OutboundUpdated: 11/21/2024 7:30 PM EST -
Track ChangePlease board Middleborough Line Train 022 (4:33 pm from Middleborough/Lakeville) on the outbound platform (Track 1) at Montello.Affected direction:
Inbound
Affected stops:
MontelloUpdated: 11/21/2024 4:42 PM EST -
Schedule ChangeThe new Fall/Winter schedule is now in effect on all lines with seasonal and on-time performance adjustments. Schedules are available online at MBTA.com/cr and will be available in hub stations soon.-The ski train will be back on the Fitchburg Line. Wachusett Mountain ski area operates a shuttle between the ski area and Wachusett station during Winter months to connect to these trains which feature a specifically modified coach equipped with racks for ski and snowboard equipment. Update to when the Ski Trains will be in effect will come out soon.
-Holiday service:
On Thursday, November 28th, 2024 (Thanksgiving Day), Friday, November 29th, 2024 (Day after Thanksgiving), Wednesday, December 25th, 2024 (Christmas Day), Wednesday, January 1st, 2025 (New Year’s Day), and Monday, February 17th, 2025 (President’s Day) all lines will operate on a weekend schedule. On Monday, January 20th, 2025 (Martin Luther King Jr. Day), and Monday, April 21st, 2025 (Patriot’s Day), all lines will operate on a regular weekday schedule.
Affected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/18/2024 3:00 AM EST -
Service Change UpcomingOn Thanksgiving Day, Thursday, November 28th and the day after Thanksgiving, Friday, November 29th, the Commuter Rail will be operating on a regular weekend schedule. MBTA.com/holidaysAffected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/21/2024 7:14 AM EST -
Station Issue OngoingThe Riverside Ave entrance at Campello Station is currently closed. Passengers may continue to use the Plain St entrance.Affected lines:
Middleborough/Lakeville LineUpdated: 9/5/2023 7:39 AM EDT -
Bike Issue OngoingSouth Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. MBTA.com/projects/south-station-transportation-center-improvements
-
Schedule ChangeThe new Fall/Winter schedule is now in effect on all lines with seasonal and on-time performance adjustments. Schedules are available online at MBTA.com/cr and will be available in hub stations soon.-The ski train will be back on the Fitchburg Line. Wachusett Mountain ski area operates a shuttle between the ski area and Wachusett station during Winter months to connect to these trains which feature a specifically modified coach equipped with racks for ski and snowboard equipment. Update to when the Ski Trains will be in effect will come out soon.
-Holiday service:
On Thursday, November 28th, 2024 (Thanksgiving Day), Friday, November 29th, 2024 (Day after Thanksgiving), Wednesday, December 25th, 2024 (Christmas Day), Wednesday, January 1st, 2025 (New Year’s Day), and Monday, February 17th, 2025 (President’s Day) all lines will operate on a weekend schedule. On Monday, January 20th, 2025 (Martin Luther King Jr. Day), and Monday, April 21st, 2025 (Patriot’s Day), all lines will operate on a regular weekday schedule.
Affected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/18/2024 3:00 AM EST -
Service Change UpcomingOn Thanksgiving Day, Thursday, November 28th and the day after Thanksgiving, Friday, November 29th, the Commuter Rail will be operating on a regular weekend schedule. MBTA.com/holidaysAffected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/21/2024 7:14 AM EST -
Parking Closure UpcomingThe Highland parking lot closed will be closed on Sunday, Dec 1 and Sunday, Dec 2 (full day closure) due to construction. Vehicles left in the lot during these times will be relocated or towed at vehicle owner’s expense.Alternative Parking at Roslindale Village
Parking Lot Reopens:
Tuesday, December 3, 2024Updated: 11/14/2024 11:25 AM EST -
Bike Issue OngoingSouth Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. MBTA.com/projects/south-station-transportation-center-improvements
-
Bike Issue OngoingThe door to enter the Forest Hills Pedal and Park is not functioning. We are working to have it addressed as quickly as possible,
-
Schedule ChangeThe new Fall/Winter schedule is now in effect on all lines with seasonal and on-time performance adjustments. Schedules are available online at MBTA.com/cr and will be available in hub stations soon.-The ski train will be back on the Fitchburg Line. Wachusett Mountain ski area operates a shuttle between the ski area and Wachusett station during Winter months to connect to these trains which feature a specifically modified coach equipped with racks for ski and snowboard equipment. Update to when the Ski Trains will be in effect will come out soon.
-Holiday service:
On Thursday, November 28th, 2024 (Thanksgiving Day), Friday, November 29th, 2024 (Day after Thanksgiving), Wednesday, December 25th, 2024 (Christmas Day), Wednesday, January 1st, 2025 (New Year’s Day), and Monday, February 17th, 2025 (President’s Day) all lines will operate on a weekend schedule. On Monday, January 20th, 2025 (Martin Luther King Jr. Day), and Monday, April 21st, 2025 (Patriot’s Day), all lines will operate on a regular weekday schedule.
Affected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/18/2024 3:00 AM EST -
Service Change UpcomingOn Thanksgiving Day, Thursday, November 28th and the day after Thanksgiving, Friday, November 29th, the Commuter Rail will be operating on a regular weekend schedule. MBTA.com/holidaysAffected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/21/2024 7:14 AM EST -
Station IssueThe West Gloucester parking lot will be closed starting at 8:00 pm on Wednesday, November 20th and will reopen on Friday, November 22nd. All vehicles in the lot after 8:00 pm on 11/20 will be towed at the owner's expense.Affected lines:
The Rockport Branch Gloucester-Manchester shuttle
The Rockport Branch Rockport-Beverly local shuttle
Newburyport/Rockport Line
The Rockport Branch Rockport-Oak Grove limited shuttle
The Rockport Branch Rockport-Salem local shuttle
The Rockport Branch Rockport-West Gloucester shuttleUpdated: 11/21/2024 12:00 AM EST -
Parking ClosureThe West Gloucester parking lot will be closed on Wednesday Nov 20 and Thursday Nov 21 (full day closure) due to construction.Alternative Parking at Gloucester
Parking Lot Reopens:
Friday, November 22, 2024Updated: 11/21/2024 12:00 AM EST
-
DelayProvidence Line Train 834 (6:46 pm from Wickford Junction) has departed Wickford Junction and is operating 15-25 minutes behind schedule due to earlier fire department activity.Affected direction:
InboundUpdated: 11/21/2024 7:08 PM EST -
DelayProvidence Line Train 829 (5:37 pm from South Station) is operating 5-15 minutes behind schedule between Sharon and Wickford Junction due to earlier fire department activity.Affected direction:
OutboundUpdated: 11/21/2024 7:27 PM EST -
Schedule ChangeThe new Fall/Winter schedule is now in effect on all lines with seasonal and on-time performance adjustments. Schedules are available online at MBTA.com/cr and will be available in hub stations soon.-The ski train will be back on the Fitchburg Line. Wachusett Mountain ski area operates a shuttle between the ski area and Wachusett station during Winter months to connect to these trains which feature a specifically modified coach equipped with racks for ski and snowboard equipment. Update to when the Ski Trains will be in effect will come out soon.
-Holiday service:
On Thursday, November 28th, 2024 (Thanksgiving Day), Friday, November 29th, 2024 (Day after Thanksgiving), Wednesday, December 25th, 2024 (Christmas Day), Wednesday, January 1st, 2025 (New Year’s Day), and Monday, February 17th, 2025 (President’s Day) all lines will operate on a weekend schedule. On Monday, January 20th, 2025 (Martin Luther King Jr. Day), and Monday, April 21st, 2025 (Patriot’s Day), all lines will operate on a regular weekday schedule.
Affected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/18/2024 3:00 AM EST -
Service Change UpcomingOn Thanksgiving Day, Thursday, November 28th and the day after Thanksgiving, Friday, November 29th, the Commuter Rail will be operating on a regular weekend schedule. MBTA.com/holidaysAffected lines:
Newburyport/Rockport Line
Haverhill Line
Lowell Line
Fitchburg Line
Framingham/Worcester Line
Needham Line
Franklin/Foxboro Line
Fairmount Line
Providence/Stoughton Line
Middleborough/Lakeville Line
Kingston Line
Greenbush LineUpdated: 11/21/2024 7:14 AM EST -
Service Change OngoingEffective Monday, Sept 9th & for approximately 7 weeks, the high-level platform on the outbound side of Attleboro station is close for renovation. Please board trains at the north end of the platform. A portable lift will be available on the platform.The staircase close to the ramp for access to the inbound platform will be closed at the same time.
This temporary travel path will allow for work on the platform as part of the Attleboro Renovation Project.
Plan for extra travel time. Thank you for your understanding.Updated: 9/16/2024 4:30 AM EDT -
Parking Closure UpcomingThe Canton Junction parking lot will be closed from Nov 24 - 27 (full day closure) due to construction. Vehicles left in the lot during these times will be relocated or towed at the vehicle owner’s expense.Alternative Parking at Route 128/Westwood Garage
Parking Lot Reopens:
Thursday, November 28, 2024Updated: 11/21/2024 12:00 AM EST -
Parking Issue OngoingThe South Attleboro Parking Lot is free until Tuesday April, 1st, 2025.
-
Bike Issue OngoingSouth Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. MBTA.com/projects/south-station-transportation-center-improvements
-
Bike Issue OngoingThe door to enter the Forest Hills Pedal and Park is not functioning. We are working to have it addressed as quickly as possible,
-
Bike Issue OngoingSouth Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance. MBTA.com/projects/south-station-transportation-center-improvements
Get T-Alerts
Tell us about your regular trips and receive text or email alerts that are relevant to you, at times when you want them.
Create an Account Sign in