Worcester Union Station Improvements
Related Service Alerts
1
service
change
details
-
Parking Issue OngoingThe Upper Parking Lot at Worcester Station is closed with the exception to accessible parking, due to construction.
Worcester Union Station is undergoing significant platform, track, and accessibility improvements. Although it’s a key transportation hub for the Worcester area and the terminus of the Framingham/Worcester Line, it’s currently the only station on the route that can serve only one train at a time. The upgrades now underway will improve the station’s function, capacity, level of service, and safety, and make it fully accessible.
Building a Better T
As part of our $9.6 billion, 5-year capital investment plan, we're renovating stations, modernizing fare collection systems, upgrading services for our buses, subways, and ferries, and improving the accessibility of the entire system.
- Contract awarded: October 2021
- Projected Completion: Spring 2025
- Budget: $45 million
- Status: Construction ongoing. Center platform opens July 1, 2024.
Rider Benefits
- A new, high-level center platform
- Track, signal, communications, and infrastructure upgrades
- New elevators, stairways, and pedestrian bridge
- Accessibility improvements to the commuter parking area
The new pedestrian bridge and elevators will be steel and glass structures with new lighting and wayfinding signs. This will provide a fully accessible route for riders to move safely and comfortably to and from the new center platform to the MBTA parking area and the neighboring community.
Service Alerts
Throughout this project, we will maintain current levels of passenger access to the platform and trains.
Any service changes will be communicated in advance on this page and via alerts.
New Center Platform and Elevators Now Open
Beginning on Monday, July 1, 2024, riders can use the new, accessible high-level center platform to board trains. From the station's main entrance, riders can access the platform through the rotunda and new access corridor, then take the stairs or elevators. From the east parking lot at 45 Shrewsbury St, riders can access the platform through the new pedestrian bridge. Riders can also check signage in the parking garage for directions.
The parking lot will remain open during construction. Some spots will be unavailable during different phases of the project. Accessible parking spaces remain available.
Project Renderings
Progress Photos
View of Elevator #1 and overall footprint of western end of newly proposed centerline platform (January 2023)
Proposed construction plans for Worcester Union Station which will include a new center platform, accessibility and infrastructure upgrades, updates to a pedestrian bridge, and more.
Foundation for newly proposed pedestrian bridge connecting lower parking lot to upper parking lot and new centerline platform for the 45 Shrewsbury Street Lot (January 2023)
Structural steel shaft for elevator from existing station to proposed centerline platform (January 2023)
Concrete construction for new stairs, pedestrian bridge, and elevator to provide access between upper and lower parking lots and new centerline platform (January 2023)
Workers install electric conduits for cables. The cables will power the electrical room, communications room, and an elevator (July 2022)
A worker installs steel reinforcement bars for pile caps at the north headhouse/pedestrian bridge foundation (July 2022)
Downloads
- Construction Advisory, 2022 (PDF, 434 KB)
- Virtual Public Meeting Presentation, May 2020 (PDF, 8.5 MB)
- Stakeholder Meeting Presentation, March 2020 (PDF, 3.9 MB)
- Stakeholder Meeting Renderings, March 2020 (PDF, 9.9 MB)
- Stakeholder Meeting Presentation, June 2019 (PDF, 13.2 MB)
Past Events
Contact Us
For all queries and comments related to the Worcester Union Station Improvements, email us at UnionStation@mbta.com.
For More Information
Get project news, updates, and info about upcoming public meetings delivered to your inbox.
Recent Updates
Building a Better T
As part of our $9.6 billion, 5-year capital investment plan, we're renovating stations, modernizing fare collection systems, upgrading services for our buses, subways, and ferries, and improving the accessibility of the entire system.