Transit Projects

Bus Maintenance Facilities Strategic Plan

The Authority has identified and assessed the current bus service, the existing bus fleet, the constraints of existing garages, the future facility equipment needs, and any sites for possible new facilities.

Among highlights of the Strategic Plan for Bus Maintenance Facilities are recommendations for upgrade of system maintenance capacity with medium- and long-term construction of north side and south side facilities. For more details, read the Strategic Plan document below, which has been divided into sections for easier download.

Part 1: Summary, Introduction, and Needs Assessment
Part 2: Recommendations for Wellington and Alewife
Part 3: Recommendations for Revere and Malden
Part 4: Recommendations for Watertown and Riverside
Part 5: Summary of Recommended Options, Environmental Considerations, Funding, and Schedule

All PDFs can be viewed with Adobe Acrobat Reader version 4.0 or higher.

A photo of the existing Wellington station (facing South):

A proposed bus facility and parking garage on the site:

Renderings of a proposed bus facility and parking garage on the site: